Van Leeuwen
870 MW Erzin Combined Cycle Power Plant

870 MW Erzin Combined Cycle Power Plant

The EPC project consists of a Combined Cycle Power Plant (CCGT) unit, with an electrical capacity of 870 MW to be constructed at a site in Hatay, Turkey for the employer Egemer A.S.

GE and GAMA Power Systems consortium manages the turn-key EPC project. The CCGT plant configuration consists of two gas turbines in a 2+2+1 multi-shaft arrangement, with associated heat recovery steam generators (HRSG’s) and a steam turbine along with all the associated power island equipment and non-plant related buildings and structures.

During 2012 and 2013 Van Leeuwen supplied an extensive range of mainly P91 pipes, fittings and flanges. Produced by Van Leeuwen Approved Manufacturers all over the world and on time CFR delivered in Turkey. First class quality, at the right time, at the right place. That’s the power of Van Leeuwen!

 

 

Project details

Client/Project Owner
Egemer A.S.
EPC/Contractor
GE-GAMA Power Systems Consortium
Country
Turkey
Region
Asia
Project name
870 MW Erzin Combined Cycle Power Plant
Awarded
2012
Material
Alloys (p-grades)
Delivered
2013
Van Leeuwen Company
Van Leeuwen Zwijndrecht
Value
$1.000.000 - $5.000.000